For a detailed instruction how to set up your netFIELD Device IO-Link Wireless MasterBridge, please follow the chapter "Getting StartedMounting and commissioning" in the User Manual. → …\Documentation\User_Manuals\... Mounting- Mark the positions to fasten the device with screws and cut the M4 holes.
- Fasten the device with the screws.
- Ground the device.
- Mount all three SMA antennas.
Connecting and booting- Connect the Ethernet M12 cable to the NFD-3090-PNS-IOLM\W device and to the PLC (PROFINET IO-Controller).
- Connect the Ethernet M12 cable to the NFD-3090-EIS-IOLM\W device and to the PLC (EtherNet/IP Scanner).
- Connect the +24 V DC SELV or PELV power supply to the NFD-3090-PNS-IOLM\W device
- Connect the +24 V DC SELV or PELV power supply to the NFD-3090-EIS-IOLM\W device.
- Connect the +24 V DC SELV or PELV power supply to the IO-Link Device.
- Switch on the power supply units of the device and of the IO-Link Device.
Commissioning PROFINET IO Device- Configure the PROFINET IO-Controller: Import the GSDML file:
...\Firmware_&_EDS\DeviceDescription\Profinet\... GSDML-V2.35-HILSCHER-NETFIELD-WIRELESS-EXPERT-20210707.xml This file is to be used if settings of the „Wireless Master Parameters“ are made using the configuration software of the PROFINET IO-Controller. ...\Firmware_&_EDS\DeviceDescription\Profinet\... GSDML-V2.35-HILSCHER-NETFIELD-WIRELESS-PDCT-20210623.xml This file is to be used if settings of the „Wireless Master Parameters“ are made using the netFIELD Web Server. - Create the configuration project with PROFINET IO-Controller and PROFINET IO-Device, select the modules and submodules and set the parameters.
- Configure the IO-Link Wireless Master NFD-3090-PNS-IOLM\W using the Web Server.
- Configure the port parameters via the PROFINET IO-Controller or using the Web Server.
- Configure the IO-Link Device.
Commissioning EtherCAT Slave- For the first commissioning, the NFD-3090-ECS-IOLM\W device requires a DHCP server.
- In the configuration software of the EtherCAT Master:
- Configure the EtherCAT Master: Import the EDS file:
...\Firmware_&_EDS\DeviceDescription\EtherCAT\... Hilscher_netFIELD_Wireless.xml. - Create the configuration project with EtherCAT Master and EtherCAT Slave, select the modules and submodules and set the parameters.
- For the subsequent steps the following configuration tools can be used:
- Configure the IO-Link Wireless Master NFD-3090-ECS-IOLM\W using the netFIELD Wireless Web Server.
- Configure the wireless IO-Link port parameters via the configuration software of the EtherCAT Master or using the netFIELD Wireless Web Server.
- Configure the IO-Link Device.
Commissioning EtherNet/IP Adapter- For the first commissioning, the NFD-3090-EIS-IOLM\W device requires a DHCP server.
- Configure the EtherNet/IP Scanner: Import the EDS file:
...\Firmware_&_EDS\DeviceDescription\EtherNetIP\... HILSCHER-NETFIELD-WIRELESS-V2.1.EDS - Create the configuration project with EtherNet/IP Scanner and EtherNet/IP Adapter, select the connection and set the parameters.
- Configure the IO-Link Wireless Master NFD-3090-EIS-IOLM\W using the Web Server.
- Configure the port parameters via the EtherNet/IP Scanner or using the Web Server.
- Configure the IO-Link Device.
Mounting without clip- Plug it onto the IO-Link Device to be connected
- Establish a cable connection from the Wireless Bridge to the IO-Link device
Mounting with clip- The clip is an easy-to-use retaining bracket to mount the Wireless Bridge to flanges, machines, equipment, and other flat surfaces
- With M3 screws or cable ties it can easily be fixed
Step-by-step instructions for commissioning the bridgeTo commission an IO-Link Device in an IO-Link wireless radio network using the Wireless Bridge, perform the following steps: - Connect the A-coded M12 supply connector of the Wireless Bridge to the power supply using a suitable M12 cable (24 V SELV/PELV power supply required). Make sure that the cable cross-section of the M12 cable is sufficiently large
- The power LED of the Wireless Bridge emits a green light. If this is not the case, check the power supply
- As soon as the Wireless Bridge is connected to the power supply, a reset cycle occurs. This takes a few seconds. During this period, the status LED shows a signal sequence in red, green, and blue
- As soon as the reset cycle is completed, the status LED starts flashing alternately purple and yellow
- Connect the IO-Link Device (sensor/actuator)
The status LED is flashing alternately purple and green Now, you can set up and configure the wireless data transfer of the Wireless Bridge
DocumentationDocumentation for all hard- and software components included in this Product DVD is available on the path: …\Documentation\... The Documentation Library on the Hilscher Knowledgebase includes further documents: https://kb.hilscher.com/display/DL/Documentation+Library+Home SupportIn case of questions, please do not hesitate to get in touch with your local Hilscher Support. E-Mail: support@hilscher.com Phone: +49 6190 9907 99 |