Attendees

Frank Fährmann

Yuriy Zavgorodniy

Former user (Deleted)

Mirko Kroll


Date

 


Scope

New set of NT100 Firmware with following key updates and features

  • all stack updates according NT100 Stack History
  • rcX update from V2.0 to 2.1
  • discontinue XXX-OMB; XXX-EIS; XXX-EIM combinatiosn (these combinations are available in NT151)

SW/FW released version

No.

Product (Variants) / Component Name

Version/Rev.

1

Loadable firmware for for netTAP 100

List of variants

V2.0.0.0

2SyCon.netV1.0500.200828.33536

Device Under Test (DUT)

No.

Product (Variants) / Component Name

Version

1netTAP 100 (several HW variants)see system test report

Release recommendation

Internal approval

(tick)

Checklist


No.

SWQ action

Check of the results

Provide reasons, if results are not satisfied or provide a link/ticket as a proof

1

Formal review of SW requirements list

No formal review needed


2

Formal review of specification (SOW)

3

Formal review of design parts

4

Perform code reviews

  • Code reviews are done, spot check of task or issue links
  • All planning tickets are done or closed
  • Getting issues... from Getting issues... issue have been reviewed.

5

Perform static code analysis

  • Static code analysis are done and report(s) are available
  • All planning tickets are done or closed
  • Static code analysis is enabled for this project (tick)

Gateway sorces improved aginst PC Lint checks:
FWNT100-380 - Getting issue details... STATUS

6

Create a test plan

  • The test plan is available and approved

Quality assurance (QA):

Development (DEV):

Conformance Tests (NXS):

7

Create test case specifications

  • Test cases are available and approved

Quality assurance (QA):

Development (DEV):

8

Perform tests

  • A test report is available
  • All relevant “Bug” tickets are closed
Quality assurance (QA):

Development (DEV):

Conformance Tests:

9

Create a version space

  • A “Version Space” is created to public the SW release
  • Or a revision list of development outputs is available

10

Perform the internal release approval

  • All planned SWQ actions above are closed




  • Ready to create a DVD

Note:

  • Ready to craete a DVD
  • KB with FW will be published, when DVD is ready
11
  • Open Issues from QA Test
  • List of open QA Bugs

     Click here to expand...

    key summary type created updated due assignee reporter priority status resolution
    Loading...
    Refresh